BACKGROUND INFORMATION |
 |
Project Location Map
|
 |
Project Study Area Map
|
 |
Project Summary Outline
(updated July 2010)
|
PHASE 1 -CORRIDOR ALTERNATIVES IDENTIFICATION |
 |
Placer Parkway Interconnect Study/Conceptual Plan
(2000) |
|
|
 |
Placer Parkway Project Study Report
(2001)
|
 |
Interviews with Community Stakeholders – Summary Report
(September 2003)
|
 |
Technical
Memorandum with Appendices A & B (September 2004) |
| |
Figures: |
| |
|
 |
Tier 1 EIS/EIR
Corridor Alternatives Identification Process
|
 |
July 2004 Newsletter
|
 |
Public Meetings Summary Report
(August 2004)
|
 |
August 2005 Newsletter
|
 |
Alternatives Development Summary Report
(September 2005) |
 |
Five Recommended Corridor Alignment Alternative - Draft for SPRTA Approval
(September 1, 2005) |
 |
PSR Corridor Alternatives Evaluated |
 |
Other Potential
Corridor Alternatives Identified and Evaluated (August 2004) - 6.9mb |
 |
Potential Corridor
Alignment Alternatives for Evaluation in the Tier 1 EIS/EIR (August
2004) - 6.9mb |
 |
Proposed Foothill Alignments Shown with PCTPA's Potential Corridor
Alignment Alternatives |
 |
Five Corridor Alignments Alternatives to be Analyzed in Tier 1 EIS/EIR
(September 28, 2005) |
PHASE 2 - TIER 1 EIS/EIR |
 |
Description
of "Tiering"
|
 |
Notice of Intent (NEPA)
(September 2003)
|
 |
Notice of Preparation (CEQA)
(September 18, 2003)
|
 |
Scoping Meetings & Scoping Process Summary
Report (October 2003)
|
 |
February 2007 Newsletter
|
 |
July 2007 Newsletter |
 |
Draft Tier 1 EIS/EIR Notice
of Availability (June 2007) |
 |
Draft Tier 1 EIS/EIR
(2 Volumes) |
 |
Draft Tier 1 EIS/EIR Technical Reports |
| |
|
 |
August 2007 Public Hearing Presentation and Materials:
|
| |
|
 |
February 2008 SPRTA Board Public Workshop - Access
and Buffer Options Presentation and Materials |
| |
February 27,
2008 – SPRTA Board Public Workshop |
| |
|
| |
March 26, 2007 - SPRTA Board Meeting |
| |
|
 |
January 2009 Newsletter |
 |
Partially Revised Draft Tier 1 EIS/EIR Notice of Availability (January 2009) |
 |
Partially Revised Draft Tier 1 EIS/EIR Notice of Availability (Extension of Comment Period) (March 2009) |
 |
Partially Revised Draft Tier 1 EIS/EIR |
| |
February 2009 Public Hearing Presentations and Materials: |
| |
|
| |
February 25, 2009 SPRTA Board Meeting |
| |
|
 |
November 2009 Newsletter |
 |
Final Tier 1 EIS/Program EIR (November 2009)
December 3, 2009 SPRTA Board Public Hearing |
| |
|
| |
FHWA’s Record of Decision |
| |
|
 |
Final Engineering Summary Report (February 2010) |
MODIFIED NEPA/404 PROCESS:
|
 |
Modified NEPA/404 MOU (April 2004)
|
 |
Purpose and Need Statement - Concurrence Version (February 2005)
|
 |
Criteria for Selecting the Range of Alternatives -
Concurrence Version (June 2005)
|
 |
Range of Alternatives - Concurrence Version (January
2006)
|
 |
Alternative(s) Most Likely to Contain the Least Environmentally
Damaging Practicable Alternative (LEDPA) - Concurrent Version (September 2009) |
| |
FHWA_March 2008 Update |
| |
June 24, 2008 FHWA Concurrence Request Letter: |
|
|
| |
August 14, 2008 US Corps/EPA Non-concurrence Letter |
|
October 15, 2008 Informal (Mid-Level Mgrs Elevation) Meeting: |
| |
|
|
October 23, 2008 PCCP & Placer Parkway LEDPA USACE Meeting: |
| |
|
|
October 23, 2008 – Congressman Lungren – USACE Coordination Meeting: |
| |
|
|
December 16, 2008 Regulatory Issues Meeting - USACE, USEPA, USFWS, FHWA - Washington D.C. |
| |
|
|
January 23, 2009 Formal (Senior Level Mgrs) Elevation Meeting – San Francisco |
| |
|
| |
April 17, 2009 Conservation Framework Meeting |
| |
|
| |
Transportation Agencies’ Follow-up to Preliminary Draft Placer Parkway Alternative 5 LEDPA Options |
| |
May 11, 2009 "Transportation Agencies" Follow-up to Preliminary Draft Placer Parkway Alternative 5 LEDPA Options |
| |
May 29, 2009 Conservation Framework Meeting #2 |
| |
|
| |
June 26, 2009 USEPA Feedback Responding to Terms of No-Access Easement |
| |
June 12, 2009 No Access Easement Information for Regulatory Agencies’ Review |
| |
July 7, 2009 Transportation Agencies Response to USEPA Feedback |
| |
July 2009 USACOE, USFWS, and USEPA Feedback |
| |
August 5, 2009 LEDPA & Mitigation Framework Meeting |
| |
August 13, 2009 FHWA Draft LEDPA & Mitigation Framework Concurrence Request |
| |
August 18, 2009 USEPA Informal Approval |
| |
Mitigation Framework - Concurrence Version (September 2009) |
| |
October 2, 2009 USEPA Formal LEDPA & Mitigation Framework Concurrence |
| |
October 29, 2009 USACOE Formal LEDPA & Mitigation |
| |
|
MEETING AGENDAS/MINUTES/MATERIALS
Meeting agendas, minutes, materials, and status reports
are available –
please contact PCTPA. |
|
Technical Advisory Committee (TAC)
|
|
Study Advisory Committee (SAC)
|
|
Policy Advisory Committee (PAC)
|
|
South Placer Regional Transportation
Authority (SPRTA)
|
|
Sutter County Board of Supervisors
|
|
Interagency Meetings (Modified NEPA/404
Process) |
| |
|